Anacreon v2.1
|
|
Table: Constructions
Construction |
Tech |
Years |
Che |
Met |
Tri |
command base |
s |
6 |
460 |
2,300 |
180 |
industrial complex |
s |
10 |
590 |
2,600 |
150 |
disrupter |
pg |
8 |
1,110 |
1,180 |
1,120 |
fortress |
pg |
12 |
840 |
2,870 |
250 |
gate |
g |
15 |
2,530 |
3,920 |
1,450 |
outpost |
b |
3 |
350 |
1,120 |
150 |
SRM |
s |
2 |
110 |
500 |
80 |
warp link |
pg |
5 |
1,560 |
2,550 |
290 |
This table lists the requirements for each type of construction. Tech is the minimum tech level required to start the construction. Years is the number of years that it will take to complete the project. Che, Met, and Tri are the amounts of chemicals, metals, and trillum needed per year of construction.
|
|